The new Gec/Ban Factory!!


After many many hours toiling, we have closure... and it looks good!!

Tuesday, May 27, 2008

Research, resources and specifications

This site was great for providing an overview and giving non-specific design informaiton.

http://www.shigerubanarchitects.com/SBA_WORKS/SBA_OTHERS/SBA_OTHERS_7/SBA_Others_7.html

The best reference by far was the book mentioned below. It helped me in terms of technical specifications, detailed drawings and background information.
- McQuaid, M., Shigeru Ban, Phaidon Press, London, 2006.

As far as deciding upon the required dimensions for the upsized building (mine), I had many discussions with my tutor Stuart and referred to other large wooden buildings such as the Vikingskipet Olympic Arena in Hamar.
I found that all the technically specific references were written for engineers and extremely difficult to understand.

I also speculated as to the specifications of the additional office floor and glazing on either end, however, I referred to alternate demonstrations for similar examples.

Thursday, May 15, 2008

Monday, May 12, 2008

Hi!

Just thought I'd let you know that the rernderings are going well and I'll post a couple soonish.

Sunday, May 11, 2008

Hey guys!

I've started on the drawings in auto cad and I figured that if I'm already doing a front elevation in order to do the modelling, we might as well just use that pic for the presentation so you two don't have to do it. :)

Thursday, May 8, 2008

Progress so far...

For our construction project we've decided to model Shigeru Ban's 'Imai Daycare Centre', Odate, Akita, Japan, 2001.


So far, we have researched the building, found plans and details, researched materials and construction methods for each element and decided upon a design schedule. We've also allocated responsibility for the detailing of certain elements and decided upon our individual 5X5 areas. The site has been assessed and we have come to a layout resolution that allows for circulation, parking, site elevations and drainage. We are currently at the stage of specifying the required dimensions for structural elements as we are adapting a small scale building to a large scale.